switch factory culture


WHY CHOOSE US  

A. More Experienced and Professional

With 36 years’ experience on manufacturing of switch and socket, distribution box and LED lights

 

B. Strong Productive Capacity:

1) The factories covers area of 68000m² of Leliu Head office and 80000m²of Jun an branch factory.

2) We have total 2000 employees, and about 100 of them are for research, 100 of them are for quality control.

3) Production capability:

Switch & socket : 800,000 to 1,000,000 pcs per month

Distribution box: 300,000 pcs per month

Distribution board: 30,000 pcs per month

LED lights: 35,000 pcs per month

4) Total production line: 36 lines

5) Total injection machine: 81 pcs

6) Total punching machine: 124 pcs

7) Automatic machine : 130 pcs

8) Testing machine: 30 pcs

9) Dustless workshop equipment: 86 pcs

 

C. Competitive Price:

We dare to say, for the same quality products, our price will be the cheapest in all of the competitors.

 

D. Free Samples:

Provide free samples before order confirm.

Provide the samples according to customer’s special demands if we don’t have it.

 

E. Better Quality:

One-stop production to ensure the quality is perfect before goods loading.

 

F. 100% Guarantee:

Our Quality Checking team checks every item before shipping, but if you still find any defective one or quality is not close to the samples, we provide refund or reproduce service, make sure you have no loss working with us.


G. Pre-sales service:
1
. For all your inquiries about us or our products, we will reply you within 24 hours.
2. Our sales are able to communicate with you in English. Feel free to email or call us. 
3. We offer OEM services. Can print your own logo on product , can customize the retail box packing and other things.
4. We have very experienced R&D engineers and we have strong ability to do ODM projects.


H. After-sales Service:
1. Quick reply on customers' questions.
2. Our company will take responsibility for products with quality problems if they are caused by us.
3. We ship goods by UPS/DHL/FEDEX/TNT express which takes 7-10 days to arrive, or by air which takes about 7 days to arrive, or by sea which takes about 30-45 days to arrive . All depend on your actual